Skip to main content

HPP Doblar 2

  • Start of operation: 2002
  • Derivation - tunnel: D = 6.5 m, L = 3900 m
  • Rated flow: 105 m3/s
  • Total head: 48.5 m
  • No. of generators: 1
  • Turbinw: Kaplan turbine, vertical
  • Generator: 3-phrase, synchronous generator
  • Supplying 110 kV network
  • Rated output: 40 MW
  • Annual production: 199,000 MWh