Skip to main content
HPP Doblar 2
- Start of operation: 2002
- Derivation - tunnel: D = 6.5 m, L = 3900 m
- Rated flow: 105 m3/s
- Total head: 48.5 m
- No. of generators: 1
- Turbinw: Kaplan turbine, vertical
- Generator: 3-phrase, synchronous generator
- Supplying 110 kV network
- Rated output: 40 MW
- Annual production: 199,000 MWh