Skip to main content
HPP Plave 2
- Start of operation: 2002
- Derivation - tunnel: D = 6.5 m, L = 5,570 m
- Rated flow: 105 m3/s
- Total head: 27,5 m
- No. of generators: 1
- Turbine: Kaplan turbine, vertical
- Generator: 3-phase, sybchronous generator
- Supplying 110 kV network
- Rated output: 20 MW
- Annual production: 116,000 MWh