Skip to main content

HPP Ajba

  • Start of operation: 2008
  • Watercourse: Soča
  • Total rated flow (m3/s): 2,5
  • Gross head (m): od 10,2 do 11,7
  • Number of generators: 1
  • Installed capacity (kW): 250
  • Generator type: asinhronski
  • Turbine type: vertikalna cevna
  • Annual average energy production (MWh): 1400
  • Output voltage (kV): 20