Skip to main content

HPP Cerkno

  • Start of operation: 1984
  • Watercourse: Zapoška
  • Average flow: 0.32 m3/s
  • Total rated flow: 0.42 m3/s
  • Rated output: 0.436 MW
  • Annual production: 1,250 MWh