Skip to main content

HPP Hubelj

  • Start of operation: 1931
  • Watercourse: Hubelj
  • Average flow: 2.80 m3/s
  • Total rated flow: 2.70 m3/s
  • Rated output: 2.1 MW
  • Annual production: 10,000 MWh