Skip to main content

HPP Jelenk

  • Start of operation: 1987
  • Watercourse: Jelenk
  • Flow: 0.23 m3/s max., 0.04 m3/s min.
  • Total rated flow: 0.22 m3/s
  • Rated output: 0.07 MW
  • Annual production: 100 MWh