Skip to main content

HPP Kneža

  • Start of operation: 2018
  • Watercourse: Kneža
  • Total rated flow (m3/s): 1,5
  • Gross head (m): 73,70
  • Number of generators: 1
  • Installed capacity (kW): 850 kW
  • Generator type: trifazni sinhroni
  • Turbine type: horizontalna Francis
  • Annual average energy production (MWh): 3.300 GWh (predvidena)
  • Output voltage (kV): 20