Skip to main content

HPP Mrzla Rupa

  • Start of operation: 1989
  • Watercourse: Idrijca
  • Average flow: 0.33 m3/s
  • Total rated flow: 0.40 m3/s
  • Rated output: 0.648 MW
  • Annual production: 1,600 MWh