Skip to main content

HPP Podmelec

  • Start of operation: 1931
  • Watercourse: Bača
  • Average flow: 6,75 m3/s
  • Total rated flow: 4.30 m3/s
  • Rated output: 0.425 MW
  • Annual production: 1,400 MWh