Skip to main content

HPP Zadlaščica

  • Start of operation: 1989
  • Watercourse: Zadlaščica
  • Average annual flow: 1.21 m3/s
  • Rated flow: 2.2 m3/s
  • Effective net head: 414.8 m
  • Turbines: two Pelton turbines, vertical
  • Generators: two 3-phase, synchronous generators
  • Supplying 20 kV network
  • Rated output: 8 MW
  • Average annual production: 35,500 MWh